+
  • S型存水弯.jpg

S-shaped trap fitting for drainage

Introduction to PVC Pipes and Fittings Polyvinyl chloride pipes (commonly abbreviated as PVC pipes in English) are plastic pipes that were among the earliest to be developed and put into practical use. They are produced by heating and extruding a mixture of polyvinyl chloride resin combined with auxiliary materials such as stabilizers, lubricants, and color masterbatches. After years of accumulated experience in processing and application, PVC pipes have now established standardized production and processing techniques, along with a comprehensive supporting infrastructure. Coupled with their economic, environmentally friendly, and cost-effective advantages, PVC pipes have become the dominant product in the rubber and plastic piping industry.


Keywords

存水

管材

施工

pvc

工程

注意事项

安装

聚氯乙烯



Product Details

I. Introduction to PVC Pipe and Fitting Products

Polyvinyl chloride (PVC) pipes—often abbreviated as PVC pipes in English—are the earliest type of plastic pipe to be developed and put into practical use. They are manufactured by heating and extruding a mixture of polyvinyl chloride resin combined with auxiliary materials such as stabilizers, lubricants, and color masterbatches. After years of accumulated experience in processing and application, PVC pipes have now established standardized production and processing techniques, along with a comprehensive supporting infrastructure. Coupled with their economic, environmentally friendly, and cost-effective advantages, PVC pipes have become the dominant product among rubber and plastic pipelines.

 

II. Characteristics of PVC Pipes

Lightweight and easy to handle, load, and unload; PVC pipes are very lightweight, making them convenient to transport, load, unload, and install, thus saving labor costs.

Excellent chemical resistance: PVC pipes exhibit outstanding resistance to acids, alkalis, and corrosive substances, making them highly suitable for applications in the chemical industry.

Low fluid resistance: The walls of PVC pipes are smooth, resulting in low resistance to fluid flow. Its roughness coefficient is only 0.009, which is lower than that of other pipe materials. Under the same flow rate, the pipe diameter can therefore be reduced.

High mechanical strength: PVC pipes exhibit excellent resistance to water pressure, external pressure, and impact, making them suitable for piping projects under various conditions.

Excellent electrical insulation properties; PVC pipes offer superior electrical insulation, making them ideal for use as conduits for wires and cables, as well as for wiring installations in buildings.

 

III. Application Fields of PVC Pipes

Water supply projects, electrical engineering, and construction engineering. Sewerage projects, telecommunications engineering, and well-drilling projects. Brine projects and natural gas projects. Chemical plants, paper mills, brewing and fermentation plants, and electroplating plants. Agricultural estates, mines, aquaculture farms, highway construction projects, golf course development projects, plastic rafts for fisheries, landscaping and greening projects, and more.

 

IV. Construction Methods and Precautions for Polyvinyl Chloride (PVC) Water Supply Pipes

Construction method

The TS adhesive application procedure is as follows:

Bevel the male pipe end at a 30° angle on the outer corner, leaving a pipe-end thickness of 1/3t.

Wipe clean the inner wall of the pipe socket and the outer wall of the pipe end within the insertion range, and mark the insertion depth.

Then apply an appropriate amount of rigid adhesive. Once the adhesive has fully evaporated and its adhesion has increased, firmly insert the male pipe into the small-diameter pipe and rotate it by 90° to ensure even distribution of the adhesive. For medium- and large-diameter pipes, you can use a wooden mallet to tap them into place.

After insertion, it should be held in place for about 30 seconds before being moved. The glued area must not be disturbed for at least 2 hours.

After the pipeline installation is completed, water pressure testing can only be conducted 48 hours later. The optimal length of the pipeline to be tested under pressure should be between 400m and 500m.

 

Live casing construction method

Bevel the male pipe end at a 20° angle, leaving a wall thickness of 1/4 to 1/3 t at the prepared pipe end; (the pipes are already beveled at the factory).

Wipe the rubber ring and the flexible groove clean, then install the rubber ring into the groove with the larger diameter facing outward.

Mark the insertion length on the male pipe end;

Apply lubricant (such as soapy water or dishwashing detergent) to the insertion portion of the male pipe end and to the inner surface of the rubber ring. Then, use a tensioning device to connect the two pipes together.

 

After the fitting is complete, use a hacksaw blade to check whether the rubber ring has been pushed over.

 

Construction Precautions

During product handling and loading/unloading, it is strictly prohibited to throw, drop, roll, or drag the items. During transportation, the bottom of the vehicle should be lined with anti-abrasion pads to prevent pipes from being bumped or damaged.

After the trench excavation is completed, the trench bottom must be manually leveled. Any hard objects such as stones must be removed, and fine sand or fine soil should be spread to protect the pipeline.

When connecting live pipe fittings, make sure to insert the rubber ring into the groove with the larger diameter facing inward and the smaller diameter facing outward, to prevent the rubber ring from flipping over.

When installing adhesive-type pipes, apply an appropriate amount of adhesive—do not use too much—to prevent the adhesive from corroding the pipe body and reducing its pressure-bearing capacity.

After connecting pipes and fittings, be sure to reinforce the branch points of the fittings with concrete.

During pipeline pressure testing, it is essential to install air vents at the initial end, highest point, and terminal end to prevent water hammer, which could cause the pipe body to rupture.

 

When there is a significant temperature difference between the water temperature inside the pipeline and the ground temperature, water should be introduced first. Only after the pipeline is completely filled with water and 24 to 48 hours have passed can the pressure test be carried out.

 

V. Construction Methods and Precautions for Rigid Polyvinyl Chloride (PVC-U) Pipes Used for Drainage

Construction method

The construction method for solid-wall drainage pipes is the same as that for PVC water supply TS pipes; please refer to the construction method for PVC water supply TS pipes.

When installing PVC double-wall hollow spiral pipes, pay attention to the installation of the hollow spiral pipe sealing ring.

PVC corrugated pipe installation method: During construction, pay attention to installing corrugated pipe rubber rings at the second and fourth grooves on the male pipe end.

For construction precautions, please refer to the national standards.

 

VI. Construction Methods and Precautions for Insulated Conduit Installation

Construction method

Use a pipe cutter to cut the pipe and trim it neatly.

Use a measuring tape to mark the positions where cold bending is required, then insert the cold-bending spring into the pipe.

Hold both ends of the pipe firmly with your hands, and apply force to bend it to the desired angle. The bending angle should be about 15% larger than the intended angle to prevent rebound after bending, which could affect normal use.

 

Construction Precautions

Light and heavy-duty electrical conduit cold-bend springs must be used in matching pairs and should not be mixed.

 

 

undefined
+
  • undefined

S-shaped trap fitting for drainage

Introduction to PVC Pipes and Fittings Polyvinyl chloride pipes (commonly abbreviated as PVC pipes in English) are plastic pipes that were among the earliest to be developed and put into practical use. They are produced by heating and extruding a mixture of polyvinyl chloride resin combined with auxiliary materials such as stabilizers, lubricants, and color masterbatches. After years of accumulated experience in processing and application, PVC pipes have now established standardized production and processing techniques, along with a comprehensive supporting infrastructure. Coupled with their economic, environmentally friendly, and cost-effective advantages, PVC pipes have become the dominant product in the rubber and plastic piping industry.

Keywords:

Product Inquiries:

  • Product Description
  • I. Introduction to PVC Pipe and Fitting Products

    Polyvinyl chloride (PVC) pipes—often abbreviated as PVC pipes in English—are the earliest type of plastic pipe to be developed and put into practical use. They are manufactured by heating and extruding a mixture of polyvinyl chloride resin combined with auxiliary materials such as stabilizers, lubricants, and color masterbatches. After years of accumulated experience in processing and application, PVC pipes have now established standardized production and processing techniques, along with a comprehensive supporting infrastructure. Coupled with their economic, environmentally friendly, and cost-effective advantages, PVC pipes have become the dominant product among rubber and plastic pipelines.

     

    II. Characteristics of PVC Pipes

    Lightweight and easy to handle, load, and unload; PVC pipes are very lightweight, making them convenient to transport, load, unload, and install, thus saving labor costs.

    Excellent chemical resistance: PVC pipes exhibit outstanding resistance to acids, alkalis, and corrosive substances, making them highly suitable for applications in the chemical industry.

    Low fluid resistance: The walls of PVC pipes are smooth, resulting in low resistance to fluid flow. Its roughness coefficient is only 0.009, which is lower than that of other pipe materials. Under the same flow rate, the pipe diameter can therefore be reduced.

    High mechanical strength: PVC pipes exhibit excellent resistance to water pressure, external pressure, and impact, making them suitable for piping projects under various conditions.

    Excellent electrical insulation properties; PVC pipes offer superior electrical insulation, making them ideal for use as conduits for wires and cables, as well as for wiring installations in buildings.

     

    III. Application Fields of PVC Pipes

    Water supply projects, electrical engineering, and construction engineering. Sewerage projects, telecommunications engineering, and well-drilling projects. Brine projects and natural gas projects. Chemical plants, paper mills, brewing and fermentation plants, and electroplating plants. Agricultural estates, mines, aquaculture farms, highway construction projects, golf course development projects, plastic rafts for fisheries, landscaping and greening projects, and more.

     

    IV. Construction Methods and Precautions for Polyvinyl Chloride (PVC) Water Supply Pipes

    Construction method

    The TS adhesive application procedure is as follows:

    Bevel the male pipe end at a 30° angle on the outer corner, leaving a pipe-end thickness of 1/3t.

    Wipe clean the inner wall of the pipe socket and the outer wall of the pipe end within the insertion range, and mark the insertion depth.

    Then apply an appropriate amount of rigid adhesive. Once the adhesive has fully evaporated and its adhesion has increased, firmly insert the male pipe into the small-diameter pipe and rotate it by 90° to ensure even distribution of the adhesive. For medium- and large-diameter pipes, you can use a wooden mallet to tap them into place.

    After insertion, it should be held in place for about 30 seconds before being moved. The glued area must not be disturbed for at least 2 hours.

    After the pipeline installation is completed, water pressure testing can only be conducted 48 hours later. The optimal length of the pipeline to be tested under pressure should be between 400m and 500m.

     

    Live casing construction method

    Bevel the male pipe end at a 20° angle, leaving a wall thickness of 1/4 to 1/3 t at the prepared pipe end; (the pipes are already beveled at the factory).

    Wipe the rubber ring and the flexible groove clean, then install the rubber ring into the groove with the larger diameter facing outward.

    Mark the insertion length on the male pipe end;

    Apply lubricant (such as soapy water or dishwashing detergent) to the insertion portion of the male pipe end and to the inner surface of the rubber ring. Then, use a tensioning device to connect the two pipes together.

     

    After the fitting is complete, use a hacksaw blade to check whether the rubber ring has been pushed over.

     

    Construction Precautions

    During product handling and loading/unloading, it is strictly prohibited to throw, drop, roll, or drag the items. During transportation, the bottom of the vehicle should be lined with anti-abrasion pads to prevent pipes from being bumped or damaged.

    After the trench excavation is completed, the trench bottom must be manually leveled. Any hard objects such as stones must be removed, and fine sand or fine soil should be spread to protect the pipeline.

    When connecting live pipe fittings, make sure to insert the rubber ring into the groove with the larger diameter facing inward and the smaller diameter facing outward, to prevent the rubber ring from flipping over.

    When installing adhesive-type pipes, apply an appropriate amount of adhesive—do not use too much—to prevent the adhesive from corroding the pipe body and reducing its pressure-bearing capacity.

    After connecting pipes and fittings, be sure to reinforce the branch points of the fittings with concrete.

    During pipeline pressure testing, it is essential to install air vents at the initial end, highest point, and terminal end to prevent water hammer, which could cause the pipe body to rupture.

     

    When there is a significant temperature difference between the water temperature inside the pipeline and the ground temperature, water should be introduced first. Only after the pipeline is completely filled with water and 24 to 48 hours have passed can the pressure test be carried out.

     

    V. Construction Methods and Precautions for Rigid Polyvinyl Chloride (PVC-U) Pipes Used for Drainage

    Construction method

    The construction method for solid-wall drainage pipes is the same as that for PVC water supply TS pipes; please refer to the construction method for PVC water supply TS pipes.

    When installing PVC double-wall hollow spiral pipes, pay attention to the installation of the hollow spiral pipe sealing ring.

    PVC corrugated pipe installation method: During construction, pay attention to installing corrugated pipe rubber rings at the second and fourth grooves on the male pipe end.

    For construction precautions, please refer to the national standards.

     

    VI. Construction Methods and Precautions for Insulated Conduit Installation

    Construction method

    Use a pipe cutter to cut the pipe and trim it neatly.

    Use a measuring tape to mark the positions where cold bending is required, then insert the cold-bending spring into the pipe.

    Hold both ends of the pipe firmly with your hands, and apply force to bend it to the desired angle. The bending angle should be about 15% larger than the intended angle to prevent rebound after bending, which could affect normal use.

     

    Construction Precautions

    Light and heavy-duty electrical conduit cold-bend springs must be used in matching pairs and should not be mixed.

     

     

Get a quote

Attention: Please leave your email address, and our specialists will contact you as soon as possible!

Get a quote

Attention: Please leave your email address, and our specialists will contact you as soon as possible!

Related products


Image name

Heat-resistant polyethylene (PE-RT)

Product Introduction Polyethylene pipe for hot and cold water systems, abbreviated as PE-RT in English. PE-RT is a non-crosslinked polyethylene material suitable for hot water piping. It is a new type of polyethylene product manufactured using a special molecular design and synthesis process. This material is a copolymer of ethylene and octene. In terms of molecular structure, its main chain consists of linear polyethylene, while shorter molecular chains of octene form its side branches. During the polymerization reaction, the number and distribution of side branches on the polyethylene chains are moderately controlled, giving the material excellent heat resistance and outstanding long-term resistance to static hydraulic pressure. PE-RT also features easy bendability without deformation or rebound, making it an ideal pipe material for underfloor heating systems. Product Features Long service life; good thermal stability and long-term pressure resistance, meeting 50-year usage requirements when applied in hot water piping systems. Excellent low-temperature impact resistance; PE-RT pipes have superior low-temperature impact resistance, making them less likely to crack under impact during winter construction. Hygienic and non-toxic; Meiergu brand PE-RT pipe products belong to the "healthy and environmentally friendly" category of green building materials. All hygienic indicators meet national hygiene standards and can be directly used in pure water delivery systems. Good flexibility; the pipes can be straightened or bent easily, facilitating installation. No preheating of the pipes is required during installation in low-temperature environments, making construction convenient. Environmentally friendly; the material is recyclable, does not pollute the environment, and qualifies as an eco-friendly and energy-saving product. Stable processing performance; PEX has issues such as difficulty in controlling crosslinking uniformity, leading to complex processing that directly affects pipe performance. In contrast, PE-RT is easy to process, and its pipe performance is largely determined by the raw materials, ensuring relatively stable performance. Good heat dissipation performance; PE-RT has excellent heat dissipation properties, with a thermal conductivity coefficient of 0.4 W/m·K. In heating applications, this enhances heat transfer efficiency and saves significant energy. Application Fields PE-RT underfloor heating pipes are suitable for residential buildings, villas, hotels, office buildings, shopping malls, hospitals, theaters, schools, libraries, exhibition halls, conference centers, swimming pools, entertainment venues, and more. PE-RT underfloor heating pipes are also used in industrial fields such as greenhouses, flower houses, machine rooms, fish farms, nurseries, livestock farms, airports, as well as outdoor ground snow-melting projects including stations, parking lots, and outdoor sports areas. Building cold and hot water supply, potable water piping systems. Also applicable in the food industry for fluid transport pipelines in beverages, alcoholic drinks, milk, and other liquid products. PE-RT Pipe Installation Methods 1.1 Lay down insulation boards and secure them to the floor with steel nails. 1.2 Choose an indoor layout configuration. 1.3 Lay out and fix the pipes according to requirements. 1.4 After the pipes are laid and installed, gather them together at the manifold installation location. 1.5 Secure the manifold in its dedicated box. Conduct system hydrostatic tests before pouring the concrete filling layer and again after the concrete curing period. 2. Construction Precautions 2.1 When bending PE-RT pipes, no heating is required. The bending radius should not be less than 8 times the outer diameter of the pipe. Use fixing clips to secure the pipe, and place clips every 12 cm along the bend. 2.2 During pipeline laying, follow the design specifications. Pipes must be laid horizontally and vertically, aligned in a straight line, and fixed at the marked positions on the insulation layer. For straight sections, use clips every 60 cm to prevent pipe deformation. 2.3 After laying the PE-RT pipes, lay the steel mesh in sequence, then pour cement mortar, and finally pave the floor. The height from the original ground to the finished floor should be between 70–100 mm. The steel mesh used should have a diameter of 25 mm and a mesh size of 50 mm in length and width. 2.4 At the beginning and end of the heating pipes where they extend above the ground and reach 1 meter from the manifold, install protective sleeves or other insulation measures to prevent damage to the pipes from the edges of the floor during flooring installation. 2.5 When installing the manifold, fix it either on the wall or in a dedicated box. When installed horizontally, the manifold should be placed above the collector, with a center distance of 200 mm. The center of the collector should be no less than 300 mm above the ground. When installed vertically, the bottom of the manifold should be no less than 150 mm above the ground. After securely connecting the underfloor heating pipes to the manifold, each circuit should be gradually flushed until clean water flows out of the pipes. 2.6 Before concealing the pipes, conduct a hydrostatic test on the pipes. The test pressure should be 1.5 times the working pressure of the pipes, but no less than 0.6 MPa. Conduct another system hydrostatic test before and after the concrete filling layer cures. The test pressure should be the working pressure at the highest point of the system plus 0.2 MPa, with the test pressure at the highest point of the system being no less than 0.4 MPa.

+

See more

< 1...101112...21 >